Single Girder Overhead Crane:
There is a hoisting unit moving left and right in the system hanging from a single girder. There are end carriages on both sides of the bridge that provides movement along the hall.
More than one hoisting units can be deployed on the bridge.
The system moves along the rails on steel or concrete runway beams.
Capacity:
1 Ton – 40 tons
Drive Group Classification:
Fem: 1Am, 2m, 3m,
ISO: M4, M5, M6